Skip to product information
1 of 6

Vesgantti

Vesgantti 38.5" Accent Chair with Movable Ottoman, Comfy Corduroy Armchair with Spring Cushion, Reading Chair with Ottoman, Modern Single Sofa for Living Room, Bedroom and Apartment, Green

Vesgantti 38.5" Accent Chair with Movable Ottoman, Comfy Corduroy Armchair with Spring Cushion, Reading Chair with Ottoman, Modern Single Sofa for Living Room, Bedroom and Apartment, Green

Regular price $434.99 USD
Regular price Sale price $434.99 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • Accent Chair with Ottoman - This versatile single-seater sofa suits living rooms, bedrooms, or studies, with a sleek design that fits modern and traditional decor. Paired with a movable ottoman, it offers extra comfort for leg support—perfect for reading, watching TV, or unwinding, letting you stretch out and relax
  • Ergonomic & Comfortable - The spring cushions of this reading chair with ottoman absorb the impact of daily use, preventing rapid wear and tear and extending the life of the footstool. With a 20.9-inch seat depth, its generously sized seat offers ample support for both sitting and propping up feet, enhancing relaxation with exceptional pressure relief that makes every moment feel effortlessly luxurious
  • FSC Certified Solid Wood - Made with materials from well-managed forests that support sustainable forestry practices. This accent chair is known for its sturdiness and solidity, with a maximum weight capacity of 440lbs. Additionally, the single sofa chair features non-slip protective backing on the bottom of the legs, providing stability and preventing damage to flooring
  • Durable Corduroy Fabric - This corduroy sofa chair features distinct parallel ridges for a smooth, plush feel. Its velvety surface and modern design exude luxury, while the thick, wear-resistant build ensures lasting comfort. Available in four colors—note slight hue variations due to monitors and lighting
  • Shipped in 2 Separate Packages - kindly allow for their arrival at different times. Easy 30-min assembly without additional tools. Cushions take 24-48 hours to fully recover due to compressed packaging. You can pat the cushion to make it fluffy and feel better. Contact us with questions

Overview

  • Brand : Vesgantti
  • Seat Depth : 20.9 inches
  • Seat Height : 19.7 inches
  • Weight Limit : 440 pounds
  • Seating Capacity : 1
  • Product Dimensions : 31.5"D x 38.5"W x 35"H
  • Item Weight : 87.3 pounds
  • Color : 38.5" - 1 Seater & Ottoman Green
  • Style : Modern
  • Special Feature : Back Support, Ergonomic, Removable Ottoman, Space Saving, Upholstered
View full details
  • Sarah M. ★★★★★

    Wall Decor & art / Framed Art Prints

    This frame completely transformed the vibe of my living room. The wood finish is gorgeous and looks way more expensive than it actually is.

  • Smith S. ★★★★★

    Modular & Sectional Sofas

    Absolute game-changer for my living room! It’s insanely comfortable—supportive yet plush—and the fabric feels so premium. Everyone who visits asks where I got it.

  • Emily R. ★★★★★

    Kitchen & Bath Decor / Glassware & Drinkware

    Shipped with extreme care—all glasses arrived in perfect condition. They are delicate-looking yet surprisingly durable.

Frequently Asked Questions


Once your order is shipped, you will receive a confirmation email containing a tracking number and a link to monitor your delivery status in real-time. You can also log into your account to view order history.

We offer a 30-day return policy for unused items in their original packaging. To initiate a return, please visit our Returns Center or contact our customer support team. Return shipping fees may apply unless the item is defective.

Care instructions vary by material. Generally, we recommend dusting with a soft, dry cloth and avoiding harsh chemical cleaners. Specific care guidelines can be found on each product page and on the item's tag.

Currently, we ship to the United States and select international regions. Standard and expedited shipping options are available at checkout. Shipping rates and delivery times are calculated based on your location.