Skip to product information
1 of 6

Vesgantti

Vesgantti 92" 6 Seats Modular Sectional Sleeper Sofa with Storage, Black

Vesgantti 92" 6 Seats Modular Sectional Sleeper Sofa with Storage, Black

Regular price $1,279.98 USD
Regular price Sale price $1,279.98 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • MODULAR SPACE-SAVING SECTIONAL SOFA – The Vesgantti modular sofa features a full modular design with a clean modern aesthetic, ideal for apartments, condos, studios, offices, basements, and family rooms. It can be freely reconfigured into a living room couch, sofa bed, U-shaped sectional, or corner sofa to fit different layouts and lifestyles. Overall dimensions: 91.7"W x 59.8"L x 26.8"H, making it a versatile centerpiece for small to medium living spaces
  • CUSTOMIZABLE COMFORT WITH ADJUSTABLE ERGONOMICS – Vesgantti sleeper sofa is engineered for personalized comfort, featuring a generous 27–54 inch adjustable seat depth with soft cushions and high-density memory foam for ergonomic support. Human-centered design allows the backrest and armrest to be adjusted to multiple angles, offering flexible lounging, sitting, and reclining positions. Designed for everyday comfort in small-space living without compromising support
  • HIDDEN STORAGE DESIGN FOR SPACE EFFICIENCY – Practicality is enhanced with built-in storage compartments under each seat and ottoman, helping maximize space in compact homes. Each compartment measures 23.4"L x 23.4"W x 6.7"H and includes a detachable partition with wide-opening access, making it easy to store and organize blankets, pillows, clothing, toys, and daily essentials while keeping your living space clutter-free
  • MODULAR EASY ASSEMBLY & FLEXIBLE CONFIGURATION – The deep seat modular sectional sofa features a modular design for simple assembly and flexible reconfiguration to fit your space needs. The sofa arrives in 5 packages (may arrive separately) with all necessary tools and clear instructions included for setup in about one hour. Two leg height options (2.76" & 4.72") allow you to create a low modern profile or extra clearance for convenient robot vacuum cleaning
  • DURABLE CONSTRUCTION & PREMIUM PET-FRIENDLY FABRIC – Built with a reinforced FSC-certified hardwood frame, this sectional storage couch ensures long-lasting stability, strength, and shape retention. Upholstered in premium velvet fabric, it is soft, skin-friendly, and designed to be scratch-resistant, durable, and pet-friendly while helping conceal everyday marks and wear. Backed by a dedicated customer service team for reliable post-purchase support

Overview

  • Brand : Vesgantti
  • Seat Depth : 26.8 inches
  • Seat Height : 18.9 inches
  • Weight Limit : 1800 pounds
  • Seating Capacity : 6
  • Product Dimensions : 54.3"D x 91.7"W x 26.8"H
  • Item Weight : 78 pounds
  • Leg Length : 2.76 inches
  • Type : Sleeper
  • Color : Black
View full details
  • Sarah M. ★★★★★

    Wall Decor & art / Framed Art Prints

    This frame completely transformed the vibe of my living room. The wood finish is gorgeous and looks way more expensive than it actually is.

  • Smith S. ★★★★★

    Modular & Sectional Sofas

    Absolute game-changer for my living room! It’s insanely comfortable—supportive yet plush—and the fabric feels so premium. Everyone who visits asks where I got it.

  • Emily R. ★★★★★

    Kitchen & Bath Decor / Glassware & Drinkware

    Shipped with extreme care—all glasses arrived in perfect condition. They are delicate-looking yet surprisingly durable.

Frequently Asked Questions


Once your order is shipped, you will receive a confirmation email containing a tracking number and a link to monitor your delivery status in real-time. You can also log into your account to view order history.

We offer a 30-day return policy for unused items in their original packaging. To initiate a return, please visit our Returns Center or contact our customer support team. Return shipping fees may apply unless the item is defective.

Care instructions vary by material. Generally, we recommend dusting with a soft, dry cloth and avoiding harsh chemical cleaners. Specific care guidelines can be found on each product page and on the item's tag.

Currently, we ship to the United States and select international regions. Standard and expedited shipping options are available at checkout. Shipping rates and delivery times are calculated based on your location.