Skip to product information
1 of 7

Vesgantti

Vesgantti Modular 8-Seater Chenille L Shaped Sectional Sofa, Light Grey

Vesgantti Modular 8-Seater Chenille L Shaped Sectional Sofa, Light Grey

Regular price $3,199.97 USD
Regular price Sale price $3,199.97 USD
Sale Sold out
Shipping calculated at checkout.
Quantity

About This

  • Spacious Modular Design: Dimensions: L 167.71" W 126.76" H 31.50". This 9 seater sectional sofa offers generous seating for family gatherings, movie nights, and guests. This versatile sectional couch blends style and function as sectional couches for living room. This modular sectional sofa supports flexible layouts, including l shaped couch, U shaped couch, or custom configurations
  • Smart Storage & Convenience: Built for modern living, this corner sofa includes USB charging ports, dual cup holders, a hidden storage console, and spacious armrest compartments. Whether storing remotes, books, tablets, blankets, or daily essentials, this modular sofa with storage keep everything organized and within easy reach. The thoughtful storage design helps reduce clutter while adding convenience to your everyday relaxation and entertainment experience
  • Premium Chenille Comfort: Upholstered in soft and durable chenille imitation linen fabric, this sofa comfy couch offers lasting comfort and performance. Built with high-density weaving, this light grey couch provides strong wear and scratch resistance, helping prevent pilling, scuffs, and long-term sagging from daily use. Thick cushions, supportive seating, and widened armrests create a cozy space for reading, watching TV, or relaxing with family
  • Durable Construction: Crafted with a sturdy solid wood frame, high-density foam, and supportive spring system, this sectional sofa with ottoman is built for lasting stability and comfort. The integrated sofa cup holder design adds functionality, while CertiPUR-US certified cushions are non-toxic, odor-free, and pet-friendly. Designed as versatile sofas para sala, this light grey sofa complements a wide range of interior styles and family living spaces
  • Multiple Package Delivery & Easy Assembly: This modern oversized sofa offers spacious seating and features a secure buckle connection system for easy setup. Designed for convenience and durability, this furniture sofas living room piece is simple to assemble and maintain. To better protect each component during transit, this sectional sofa is shipped in 7 separate packages, which may arrive at different times

Overview

  • Brand : Vesgantti
  • Seat Height : 17.7 inches
  • Weight Limit : 250 pounds
  • Seating Capacity : 9
  • Product Dimensions : 167.71"D x 126.76"W x 31.5"H
  • Item Weight : 80.2 pounds
  • Leg Length : 2.36 inches
  • Type : Sectional
  • Color : Chenille-light Gray
  • Style : Modern
View full details
  • Sarah M. ★★★★★

    Wall Decor & art / Framed Art Prints

    This frame completely transformed the vibe of my living room. The wood finish is gorgeous and looks way more expensive than it actually is.

  • Smith S. ★★★★★

    Modular & Sectional Sofas

    Absolute game-changer for my living room! It’s insanely comfortable—supportive yet plush—and the fabric feels so premium. Everyone who visits asks where I got it.

  • Emily R. ★★★★★

    Kitchen & Bath Decor / Glassware & Drinkware

    Shipped with extreme care—all glasses arrived in perfect condition. They are delicate-looking yet surprisingly durable.

Frequently Asked Questions


Once your order is shipped, you will receive a confirmation email containing a tracking number and a link to monitor your delivery status in real-time. You can also log into your account to view order history.

We offer a 30-day return policy for unused items in their original packaging. To initiate a return, please visit our Returns Center or contact our customer support team. Return shipping fees may apply unless the item is defective.

Care instructions vary by material. Generally, we recommend dusting with a soft, dry cloth and avoiding harsh chemical cleaners. Specific care guidelines can be found on each product page and on the item's tag.

Currently, we ship to the United States and select international regions. Standard and expedited shipping options are available at checkout. Shipping rates and delivery times are calculated based on your location.